MetroPit

Humes MetroPit incorporates a special kerb entry design for those road conditions where a higher flow rate capacity is required.

Add to my enquiry

Benefits

  • Easy installation.
  • Fully precast in the factory.
  • Channel discharges directly to the sump.
  • Less potential for blockages.
  • Slim surface footprint. Less impact on the footpath or grass verge.
  • Front lip controls the level of the channel.
  • Large capacity sump (1050 or 1200 Manhole).
  • High inlet capacity.
  • Superior value.
  • Saves time on the job. Installed in-line with the kerb and channel. No deviation of services, base course or tar-seal required.
  • Consistent finish made to NZS 3109:1997.
  • Safer for cyclists.

Application

  • Roadways
  • Motorways
  • Tight horizontal and vertical curvatures
Humes MetroPit Brochure
427 KB
pdf

Benefits

  • Easy installation.
  • Fully precast in the factory.
  • Channel discharges directly to the sump.
  • Less potential for blockages.
  • Slim surface footprint. Less impact on the footpath or grass verge.
  • Front lip controls the level of the channel.
  • Large capacity sump (1050 or 1200 Manhole).
  • High inlet capacity.
  • Superior value.
  • Saves time on the job. Installed in-line with the kerb and channel. No deviation of services, base course or tar-seal required.
  • Consistent finish made to NZS 3109:1997.
  • Safer for cyclists.

Application

  • Roadways
  • Motorways
  • Tight horizontal and vertical curvatures